🟡
Contested
🔄 Follow-up
Nov 11, 2026
CoreWeave Says Old Nvidia Chips Got Pricier
Days after Microsoft walked away from older Nvidia capacity at Oracle, CoreWeave told investors rental prices for the same generation of chips rose 30–50% in a single quarter and now sit above their original contract rates. The same company said it can't borrow unsecured at today's yields.
📌 Original: Microsoft Turned Off Oracle's Older Nvidia Chips →THE SIGNAL
CoreWeave Q3 2026 earnings call, Nov 10: pricing for Ampere and Hopper GPUs rose 30–50% quarter over quarter and is above original contract prices. About 130,000 GPUs come off contract in 2027 and roughly 170,000 in 2028; management says renewals at current pricing could add close to $4 billion of annualized revenue in 2027 with no new capex.
Same call: no new parent-level unsecured debt through 2027 "given current yields." Remaining capex will be funded by loans tied to specific contracts, including a new facility for investment-grade tenants at an implied 7–7.5%.
Q3 results: revenue $3.66 billion (+168%), operating income $207 million, interest expense $846 million, net loss $709 million. Q4 interest guided to $1.05–1.15 billion.
View source ↗
2026-11-10
THESIS CONNECTION
The parent card read Microsoft's exit from older chips at Oracle as a sign of surplus: if the biggest buyer is handing back prior-generation GPUs, the glut starts at the old end of the fleet. Prior-generation rental pricing is the cleanest test of that, because a seller with excess capacity has to cut price there first.
CoreWeave says the opposite is happening. If its numbers hold, older chips are scarcer, not surplus, and the glut thesis loses its best early signal. That is disconfirming evidence and it gets full weight.
Two things keep it contested rather than settled. The figure comes from the seller, with no third-party price series behind it yet. And the same company, with assets supposedly earning more every quarter, is paying four times its operating income in interest and is locked out of the unsecured bond market. Its 2032 bonds traded at 74.75 cents a week ago. The chips may be worth more; the balance sheet holding them still can't fund itself without a creditworthy tenant attached to each loan.
WHAT TO WATCH
- Independent GPU rental price indices for A100 and H100 over the next quarter
- 2027 renewals on the ~130,000 GPUs rolling off contract — the price they re-sign at is the real test
- Microsoft and Oracle: whether the released older capacity gets re-leased, and at what rate
- Falsifier for the update: third-party data showing prior-generation pricing flat or falling while CoreWeave reports gains